What do I need to send, fax or E-Mail? Please print and complete this page to include in your package. |
| |
| New Residences or Additions: |
- Floor Plan(s) with North Arrow.
- Roof Plan (for skylights and overhangs, if any).
- Elevations (to scale) or Window Schedule or Sizes marked on Floor Plans.
- Sections or Floor Type and Wall Heights.
- Insulation planned for wall, floors, roofs (if other than required minimums).
- Glazing Types (single/dual pane, metal/wood/vinyl/frames, U-values if other than standard glass).
|
| Required Existing Residence Information For Lenient Addition Compliance: |
- Demolition floor plans showing existing walls to be covered by addition.
- Existing windows to remain or be replaced (marked on plan or by elevations to scale).
- Roof Plan (for skylights and overhangs, if any).
- Existing glazing type(s) (single/dual pane, metal/wood/vinyl frames, U-values if other than standard glass.
- Proposed Floor Plan (if separate from demo plan) with North Arrow.
- Proposed Roof Plan (especially for skylights).
- Proposed Windows (By schedule, elevations to scale - or marked on plans).
- Sections or written information about the Floor Type and Ceiling / Wall Heights.
- Insulation upgrades marked on plans.
- Glazing upgrades (i.e. replacements) marked on plans.
|
| Non-Residential (Commercial) |
| Envelope |
- Floor Plan with North Arrow & Roof Plan (if skylights)
(If not a stand-alone building, please advise where the space is surrounding by other conditioned space) - Elevations or Window Schedule or Window Sizes Marked on Plans
(Please include any information regarding overhangs or awnings to be used if not shown on plan) - Type of Glazing and Frames planned if other than standard storefront type.
- Sections or Floor Type and Ceiling Heights information.
- Wall/Roof Construction (include insulation planned or in use, metal/wood stud, etc.)
|
| HVAC (Mechanical) |
- All five (5) envelope items above.
- Floor Plans or Mechanical Plans showing desired zoning.
- Equipment Schedule which should include equipment selection, exhaust fans and hot water source selections.
- Lighting Load (if we are not currently providing these calculations and available. If not available we will model the default value for the occupancy.)
- Occupant Load.
|
| Lighting |
- Floor Plan and/or Reflected Ceiling Plan showing task areas within space and ceiling heights.
- Fixture / Lighting Schedule.
- Interior elevations and/or information for lighted display elements in the space (i.e., merchandise cases, wall units, art work, menu boards, etc.)
|